Rampart has a hydrodemolition system that is ideal with the changing environmental requirements. They are proof that when environmental agencies require 100% containment during the hydrodemolition op...
Capabilities of the Hydrodemolition hand lance/hand wand. 23 Jun 2012 | 02:04 am
Yes, it is true that there are hand lances or hand wands in the Hydrodemolition industry that operate at the same ultra-high pressure as the standard cutting tractor/robot (35k psi). These hand lance...
How much material will come out? 23 Jun 2012 | 02:01 am
This very commonly asked question is very difficult to answer accurately. Many contractors, whom are not very experienced with the Hydrodemoliton process, tend to routinely ask this very question. S...
Can Rampart Perform Hydro on This Wall? 13 Jun 2012 | 04:58 am
Yes we can! Stay tuned. Images of the work in progress coming soon.
Project Completed in Pocatello, ID 2 Jun 2012 | 02:57 am
Rampart just wrapped up it’s part in a bridge deck resurfacing project for the Idaho DOT in Pocatello, ID. The project was originally scheduled to be 1.25″ of concrete removal but we were asked to inc...
Watertown, NY RT 3 Over Black River: Phase 1 Complete 22 May 2012 | 08:59 am
Rampart recently completed Phase 1 of a project in Watertown, NY. The project involved removing 2″ of concrete from the deck of the Rte. 3 Bridge over the Black River. The project also included Vacuum...
Winning Entries From Rampart’s 2011 Employee Photo Contest 7 Mar 2012 | 11:33 am
Winning Entries From Rampart’s 2011 Employee Photo Contest Best Technical Photo Taken By: Bob Shearer Location: Montreal Canada Job Type: Bridge Deck Scarification Best Safety Photo Taken ...
Rampart Completes One of the Largest Hydrodemolition Projects to Date 7 Mar 2012 | 10:03 am
Rampart Completes One of the Largest Hydrodemolition Projects to Date Rampart Hydro Services of Pittsburgh, PA has recently completed one of largest continuous concrete hydro – demolition projects...
Mole Update: 1 Year Later 17 Feb 2012 | 05:07 am
One year ago we featured “Meet The Mole: Rampart’s Latest Custom Built Machine” on our news feed. A year later and the The Mole, in fact three of them have been happily removing deteriorated concrete ...
“O Canada!” 6 Jan 2012 | 06:26 am
Last season the first phase of a bridge scarification project was performed for the Ministry of Transportation in Montreal, Canada. The project had its own set of unique phasing details which added a...